Carbotura
Engineering Portal
Confidential
Pregenesis Protocol — Frame TDS

CBT-FR-PRE-001 — Trough 1 (Main)

Document Number
CBT-FR-PRE-001
Revision
Rev 0
Classification
ISC-2 Confidential
Approved
2026-07-10 · A. Witters
Portal-Published Frame TDS · Rev 0

Approved by Architect on 2026-07-10 (exchange commit f09c50d) with rulings C-1 (a) split, C-3 (b) Z-03 pending DHA, C-15 ASI internal QA + PE stamp. Source payload inbox/CAFI-pregenesis-trough1-baseline@1.0.0 (sim_hash sha256:ad2ab5…8f6c). Digital Triplet binding is DOCUMENTATION-DERIVED for this mechanical Frame (reactor-coupled Frames CBT-FR-REG-* will carry proper multiphysics bindings).

1. Purpose & Scope

CBT-FR-PRE-001 is the first serialized, FAT-certifiable, warranty-passported Frame in the Pregenesis™ Protocol. It performs mechanical size reduction of unsorted Manufacturing Feedstock (mixed municipal solid stream + end-of-life tires) to <50 mm, recovers ferrous material as a product stream, and meters conditioned feed to the downstream Blend Frame CBT-FR-PRE-003.

The Frame contains no thermal conversion, no chemistry, no gas-phase operations. Mechanical only.

2. Frame Delivery Overview

Frame IDCBT-FR-PRE-001
Line (parent)L-TROUGH1 (Pregenesis Trough 1)
Sibling FrameCBT-FR-PRE-004 (redundant SHRD-SHR-002)
Modules containedM-SHRD-P1 (partition), M-FEMAG-P1, M-WGH-P1
Equipment count5 items
Shipping modeROAD-OPEN-SKID (two-deck rack)
Total dry weight21,600 kg
Installed electrical272 kWe
Installed thermal0 kWth
Area classificationZ-03 combustible-dust (pending DHA per C-3)
Certifying signatoryASI internal QA + PE stamp (per C-15)
DIAG-FR-PRE-001-01 CBT-FR-PRE-001 — Frame Outline Drawing
Frame Outline
Process In
none modeled yet
CBT-FR-PRE-001
M-SHRD-P1 · ShreddingFeeder + Primary Shredder + Hammermill
M-FEMAG-P1 · Ferrous RecoveryOverband magnet
M-WGH-P1 · MeteringWeigh-feeder / surge bin
Process Out
Ferrous Metal (Stage 1)product stream
Liquifactliquid drainage aggregation
Auto-generated from the Frame Designer data model (Property/Building/Zone/Line/Frame/Module/Equipment schema, CBT-TB-PORTAL) — Sheet 02 canonical port layout. No Process In stream or utility ports are modeled for this Frame yet; shown as-is rather than invented.

3. Line Context

Under D-FME-01 R6 (7-level FMEA hierarchy: Line ⊃ Frame ⊃ Module ⊃ Equipment), CBT-FR-PRE-001 is one of two sibling Frames within Line L-TROUGH1. Sibling: CBT-FR-PRE-004 (redundant primary shredder).

L-TROUGH1 is one of three Pregenesis Lines that feed the Blend Frame:

4. Module Composition

Module IDFunctionEquipment count
M-SHRD-P1 (partition)Size Reduction — feed metering, one primary shredder, hammermilling to <50 mm3 items
M-FEMAG-P1Ferrous Recovery — overband magnetic recovery of steel + liberated tire wire1 item
M-WGH-P1Metering — gravimetric weigh-feeder + surge bin to Blend Frame1 item

Second redundant primary shredder (SHRD-SHR-002) is packaged in sibling Frame CBT-FR-PRE-004 per D-FME-01 R1 (envelope split) and Architect Ruling C-1.

5. Equipment Schedule

TagDescriptionDutyDry Weight (kg)Plan Area (m²)Electrical (kWe)
SHRD-FDR-001Drag-Chain Trough Feeder100 TPD; 7 kW3,000247
SHRD-SHR-001Primary Shredder A100 TPD @ 50% duty; 160 kW9,50016160
SHRD-HMR-001Hammermill100 TPD; 90 kW5,5001090
SHRD-MAG-001Overband Ferrous Magnet100 TPD; 6 kW1,00066
SHRD-WGH-001Weigh-Feeder / Surge Bin100 TPD; 9 kW2,600129
Totals21,60068272

Design T, P, materials, and L·W·H are all TBD in the payload (mechanical ambient; formal ratings pending detailed engineering).

6. Fit Check

ConstraintLimit (ROAD-OPEN-SKID single-deck)ActualResult
Floor plan area (single deck)39.47 m²68 m²2-DECK REQUIRED
Floor plan area (two deck)78.94 m²68 m²PASS
Gross weight36,287 kg21,600 kgPASS

7. Area Classification & Utilities

Area classification: Z-03 (combustible dust)

Per Architect Ruling C-3 (2026-07-10): dry size-reduction of mixed MSW (paper / film plastics / tire crumb) is a recognized explosible-dust hazard under NFPA 652 / NFPA 654. Z-03 working assumption applied pending formal Dust Hazard Analysis (DHA) at OER Gate 2.

Electrical selection: Class II Div 2 minimum inside the Frame; Class II Div 1 in the immediate vicinity of any equipment producing airborne fines.

UtilityDemandSource
Electrical272 kWe installedZero-E PowerBlock™ via NEXUS Z1
Thermal0 kWth
Steam0 kg/hr
Instrument airTBDNEXUS Z3

8. Frame-Boundary Interfaces

Stream IDFromToPhaseMass Flow (kg/hr)T (°C)P (barg)Connection
S-MSW-TIRES-INPLANT-INLETCBT-FR-PRE-001solidTBD250mechanical
S-FEED-SHR-B-OUTCBT-FR-PRE-001CBT-FR-PRE-004solidTBD250mechanical (Y-split feed)
S-FEED-SHR-B-INCBT-FR-PRE-004CBT-FR-PRE-001solidTBD250mechanical (return)
S-FERROUS-P1CBT-FR-PRE-001SOLDsolidTBD250mechanical
S-FEED-DEFE-P1CBT-FR-PRE-001CBT-FR-PRE-003solidTBD250mechanical

Mass balance cannot close at this Frame — inbound and outbound mass flows are TBD (100 TPD partition depends on blend recipe, not fabricated).

9. UWP Manifest

Per D-FME-01 R5, the Frame's Unitized Warranty Passport is a nested manifest of Modules and Equipment. Structure:

OEM certificate references and warranty periods are TBD pending OEM selection.

10. FAT Plan Reference

FAT plan document: TBD. Expected scope for a mechanical size-reduction Frame:

11. Digital Triplet Binding

Provenance: DOCUMENTATION-DERIVED

This Frame is upstream of the Recyclotron™ multiphysics model and is not bound to a CAFI simulation run. All equipment values are flowsheet nameplate figures sourced from apps/api/scripts/data/reactorTrain.ts, packaged in inbox/CAFI-pregenesis-trough1-baseline@1.0.0/ (sim_hash sha256:ad2ab5…8f6c, verified).

Documentation-derived provenance is doctrinally acceptable for mechanical Frames per D-FME-01. Regenesis™ Frames (CBT-FR-REG-*) will carry proper Digital Triplet bindings.

12. PFMEA Hook

Process FMEA reference: TBD. Placeholder rows (illustrative):

13. MRL Claim

Manufacturing Readiness Level: working self-assessment MRL 6–7 (formal DOE/DOD MRL assessment TBD via Item 6 sourcing).

14. Manufacturing Origin

ASI facility: TBD. Production cell reference: TBD. Expected lead time: TBD.

15. Certification & QMS

Certifying entity: ASI internal QA + PE stamp (per Architect Ruling C-15). QMS framework: ISO 9001 baseline (aspirational IATF 16949). Revisit third-party witness (TÜV / SGS / BV) at OER Gate 2 per Frame class.

16. Risk Register

R-001 · HIGH · S:7 P:9 D:2 RPN:126

Frame envelope split. Fit-check fails single-Frame ROAD-OPEN-SKID (68 m² vs 39.47 m² single-deck). Mitigation: two-deck rack ROAD-OPEN-SKID (78.94 m² available), plus separate Frame CBT-FR-PRE-004 for SHRD-SHR-002. Ratified 2026-07-10 (Architect Ruling C-1).

R-002 · MEDIUM · S:4 P:8 D:5 RPN:160

Mass flow partitioning depends on blend recipe. Trough 1 / Trough 2 split of 100 TPD basis pending recipe definition. Mass balance cannot close at Frame boundary until defined. Mitigation: blend recipe authoring; iterate this Frame TDS on Twin follow-on payload.

R-003 · MEDIUM · S:3 P:9 D:6 RPN:162

Operating vs installed electrical draw not characterized. Installed 272 kWe is nameplate; steady-state operating figure lower (shredder at ~50% duty). NEXUS Z1 load-schedule needs operating figure. Mitigation: Twin operating-duty case in follow-on payload version.

R-004 · MEDIUM · S:6 P:6 D:3 RPN:108

Dust hazard analysis pending. Z-03 combustible-dust working assumption applied per C-3; formal DHA (NFPA 652 / NFPA 654) is OER Gate 2 open item. If DHA finds Z-02 or Z-01 required, electrical selection escalates. Mitigation: commission DHA via Item 3 or Item 5 sourcing engagement.

17. Assumptions & TBDs

See draft-v1 §17 for the full 15-item enumerated list. Key items:

18. Approval & Iteration Notes

Approval: Rev 0 approved by Architect A. Witters on 2026-07-10 via exchange-repo commit f09c50d with rulings C-1 (a) split, C-3 (b) Z-03 pending DHA, C-15 ASI internal + PE stamp.

Twin acknowledgment: Twin ACKed draft v1 (exchange commit c8a9bea) with no numeric disputes; four conditions (C-1..C-4) raised as architectural items now resolved.

Iteration items for Rev 1: blend recipe (closes R-002), operating-kWe (closes R-003), DHA outcome (closes R-004), sibling-Frame integrated commissioning test results.


Portal-published · CBT-FR-PRE-001 · Rev 0 · Carbotura Inc. · 2026-07-10 · ISC-2 Confidential