Pregenesis Protocol β€” FMEA Register

Failure Mode & Effects Analysis Register

Modules 0A/0B/0C & Modules 1–4 | Interactive β€” filter by module, severity, or status

Doc No.CBT-PRE-FMEA-001
RevisionRev 0
StatusActive Register
GovernanceFMEA.prompt.md v1.0
RPN Escalation Thresholds
RPN β‰₯ 200: Immediate engineering review β€” must be CLOSED before IFA release  |  125–199: Action required before OER Gate 3  |  80–124: Action recommended β€” quarterly review  |  <80: Monitored
β€”
Total Entries
β€”
RPN β‰₯ 200
β€”
RPN 125–199
β€”
Open Actions
β€”
Closed
FMEA Risk Matrix β€” RPN Distribution by Module
FMEA IDModTagFailure Mode System EffectSPDRPN Current ControlsAction / OwnerStatus
CBT-PRE-FMEA-001 | Rev 0 | April 2026 | CONFIDENTIAL β€” CARBOTURA INC.
RPN = S Γ— P Γ— D | Governed by FMEA.prompt.md v1.0 | Actions tracked to named owners and OER gates