Pregenesis Protocol — FMEA Register
Failure Mode & Effects Analysis Register
Modules 0A/0B/0C & Modules 1–4 | Interactive — filter by module, severity, or status
RPN Escalation Thresholds
RPN ≥ 200: Immediate engineering review — must be CLOSED before IFA release |
125–199: Action required before OER Gate 3 |
80–124: Action recommended — quarterly review |
<80: Monitored
—
Total Entries
—
RPN ≥ 200
—
RPN 125–199
—
Open Actions
—
Closed
FMEA Risk Matrix — RPN Distribution by Module
| FMEA ID | Mod | Tag | Failure Mode | System Effect | S | P | D | RPN | Current Controls | Action / Owner | Status |
|---|
CBT-PRE-FMEA-001 | Rev 0 | April 2026 | CONFIDENTIAL — CARBOTURA INC.
RPN = S × P × D | Governed by FMEA.prompt.md v1.0 | Actions tracked to named owners and OER gates