Pregenesis Protocol — Technical Design Specification

Module T2: Trough 2 Processing
Dewatering · Indirect Thermal Drying · Pulverizing

Sludge & Enhancement Admix processing to <500 μm via Case 2 post-centrifuge pathway. WHSG thermal source confirmed 200–400°C.

Doc No.CBT-PRE-TDS-004
RevisionRev 3
OER ClassClass 2 Target — Not Yet Released
DateApril 2026
CaseCase 2 CONFIRMED
ClassificationConfidential
Working Document — Pre-Release Engineering Development
This document is a working specification. PE release requires Lead Systems Architect authorization. ARM-2026-002 incorporated. T2-PDR superseded by T2-ITD. WHSG thermal source (200–400°C) via NXS-Z2 replaces steam header.
Document NumberCBT-PRE-TDS-004
RevisionRev 3 — April 2026
Case SelectionCase 2 — Post-Centrifuge (CONFIRMED at OER Gate 1). Decanter centrifuges pre-dewater sludge to ~25–30% DS before drying. T2-ITD sized accordingly — 36× smaller than Case 1.
Rev 3 Change SummaryARM-2026-002 Cluster E: T2-PDR → T2-ITD throughout. Thermal input: WHSG High-Temp Thermal (200–400°C) via NXS-Z2 per ARM-2026-002 Cluster F. ICD-WHSG-T2ITD-001 added. NEXUS zone load schedule added. Vendor matrix updated: LCI Corp shortlisted for T2-ITD. S4-R6: ASI generic throughout.
Governing ECNsCBT-PRE-OER-AMD-001 Rev 1 · CBT-PRE-ECN-003 Rev 1 · ECN-004 · ECN-005
Governing ARMsARM-2026-001 · ARM-2026-002
Revenue BaselineRevCon 3 — $150M–$325M/yr, 400 TPD baseline
ChairmanAllen Witters

1. Executive Summary

Case 2 Selection — CONFIRMED at OER Gate 1
T2 Processing is designed for Case 2 — post-centrifuge dewatering prior to Indirect Thermal Dryer. Decanter centrifuges pre-dewater sludge to ~25–30% DS before drying. This reduces T2-ITD size by ~36× vs. Case 1 (direct drying). Case 2 is the governing design basis for all equipment specifications and CAPEX in this document.
T2 Lumpbreaker Kinetic Isolation (ARM-2026-001)
T2 Lumpbreakers incorporate ASI-ISO-LBK-001 integrated neoprene isolation pads and steel inertia frame within skid boundary. Static deflection: 1.5 in. (38 mm). Rated load: 8 tons/unit. Vibration trip: ≤7 mm/s RMS (ISO 10816-3) to module PLC. Site civil = standard slab.

This TDS defines engineering requirements for Module T2 — Trough 2 Processing. T2 receives sludge and Enhancement Admix manufacturing feedstock from Trough 2 and liquid biosludge from Module 0D, processes it through dewatering, indirect thermal drying, and pulverizing stages, and delivers <500 μm dry Enhancement Admix and sludge char to the Shredder Train Enhancement Admix circuit for EAF blending.

All throughput guarantees and performance metrics are baselined to RevCon 3: $150M–$325M/yr revenue floor at 400 TPD baseline factory configuration. Carbotura Inc. holds all design authority. The ASI (vendor pending D-ASI-01) holds no design authority.

2. Facility Context & Module Boundaries

Upstream inputsTrough 2 sludge/Enhancement Admix feedstock (CBT-PRE-TDS-002 §5.5) · Liquid biosludge from Module 0D (CBT-PRE-ECN-003) via LBS-MNF-001 to Trough 2 liquid inlet port
Downstream output<500 μm dry Enhancement Admix + sludge char → SHRD-APZ/EAS Enhancement Admix circuit (CBT-PRE-TDS-003) via pneumatic transfer (4-in. 316L SS)
Thermal input (cross-protocol)WHSG High-Temperature Thermal (200–400°C steam or thermal oil) from REG-WHSG-001 via NXS-Z2-FLUID; connector ASI-THM-HT; ICD-WHSG-T2ITD-001
Leachate outputCentrifuge and T2-ITD condensate → Liquifact collection manifold → PRE-LFB-001 → PRE-EVP-001
APS connectionsAll T2 dryer vapor captures, lumpbreaker dust connections to APS via ASI-APS-FLG
NEXUS zonesNXS-Z1-ELEC (power + data) · NXS-Z2-FLUID (WHSG High-Temp Thermal + cooling) · NXS-Z3-GAS (N², instrument air) · NXS-Z4-MAT (APS ductwork + pneumatic transfer)

3. Process Description — Case 2

StepEquipmentActionOutput StateKey Param
1Trough 2 FeedSludge/Enhancement Admix/liquid feed from Trough 2 walking floor + Module 0D liquid inletMixed wet sludge + Enhancement Admix; 60–85% moistureNIR routes by DS%
2Lumpbreaker (T2-LBK-001/002)Reduces lumpy Enhancement Admix to <25 mm. ASI-ISO-LBK-001 isolation.<25 mm Enhancement Admix + wet sludgeVibration trip ≤7 mm/s
3Decanter Centrifuge (T2-DCN-001/002)Pre-dewaters sludge fraction to ~25–30% DS. Centrate to Liquifact system.~25–30% DS sludge cakePolymer conditioning required
4Polymer Conditioning (T2-PCM-001)Inline polymer dosing to sludge before centrifuge. Improves DS% and cake release.Conditioned sludgePolymer: 4–10 kg/ton DS
5Indirect Thermal Dryer (T2-ITD-001/002)High-temperature indirect thermal drying. WHSG thermal input 200–400°C via NXS-Z2. Reduces sludge cake to <10% moisture.Dry sludge char; <10% moistureWHSG thermal 200–400°C; 1.2–1.5 kg thermal equiv./kg H&sub2;O evaporated
6Impact Mill / VRM Pulverizer (T2-IMP/VRM)Pulverizes dried Enhancement Admix and sludge char to <500 μm.<500 μm at P90Grindability-dependent
7Pneumatic Transfer (T2-PNT-001)Transfers <500 μm product to SHRD-EAS silos via 4-in. 316L SS line.Enhancement Admix/char at SHRD-EAS inlet80 psi max transfer pressure

3.2 Mass Balance (Case 2, 400 TPD Canonical Basis)

Trough 2 input~160 TPD wet sludge + Enhancement Admix (400 TPD proportional to nameplate)
Module 0D liquid inputVariable — routed per DS% threshold
Centrifuge water removal~70–80 TPD centrate to Liquifact system
T2-ITD evaporation~30–40 TPD water vapor to APS condensate recovery
Pneumatic output to SHRD-EAS~50–70 TPD dry Enhancement Admix + sludge char <500 μm

4. Feedstock Design Envelope

ParameterP50P90 (Design Limit)
Sludge inlet DS%2–8%Up to 12% (liquid biosludge from Module 0D)
Sludge particle size<5 mm<25 mm
Sludge moisture70–82%Up to 85%
Enhancement Admix moisture8–20%; particle <50 mm lumpsUp to 30%; particle <75 mm
Enhancement Admix SiO&sub2;30–45%Up to 50%
DS routing threshold (Module 0D)DS≥8%: Trough 2 decanter path · DS<8%: bypass decanter → T2-ITD surge tank directly

5. Module Equipment Specifications

5.1 T2-LBK-001/002 — Enhancement Admix Lumpbreakers + ASI-ISO-LBK-001

Kinetic Isolation: ASI-ISO-LBK-001
Steel inertia frame with neoprene isolation pads; 4-point arrangement; 1.5 in. static deflection; 8 tons rated load; vibration trip ≤7 mm/s RMS (ISO 10816-3) to module PLC.
TagT2-LBK-001 / T2-LBK-002
TypeSingle-rotor cage mill (lumpbreaker)
Design capacityUp to 200 TPD input (T2 Enhancement Admix fraction); 50% duty cycle
Output<25 mm Enhancement Admix lumps for centrifuge and dryer feed
Motor22–37 kW; VFD; ATEX Zone 22
Kinetic isolationASI-ISO-LBK-001: neoprene pad mounts, 1.5 in. static deflection, 8 tons/unit, steel inertia frame; vibration trip ≤7 mm/s RMS to PLC
CAPEX [Class 2 ±15%]$160K–$360K per unit

5.2 T2-DCN-001/002 — Decanter Centrifuges

TagT2-DCN-001 / T2-DCN-002
TypeHorizontal scroll decanter centrifuge; continuous; polymer-conditioned sludge duty
Design capacityEach unit rated for full T2 sludge fraction; 50% duty cycle
Output (DS%)25–30% DS sludge cake from 2–12% DS feed (Case 2 design basis)
Motor37–55 kW main bowl motor; 15–22 kW back-drive; VFD both; ATEX Zone 22
MOC316L SS bowl and scroll; hard-facing on scroll flights for abrasion resistance
Polymer integrationInline polymer dosing at centrifuge inlet (T2-PCM-001)
CAPEX [Class 2 ±15%]$800K–$1,800K per unit

5.3 T2-ITD-001/002 — Indirect Thermal Dryers

OPEN — ICD-WHSG-T2ITD-001 (OER Gate 2)
T2-ITD sizing requires: (1) D-13 resolved (WHSG thermal budget confirmed); (2) D-THM-01 resolved (WHSG steam parameters); (3) LCI Corp and second vendor OEM quotes. CAPEX range maintained pending OEM quote.
TagT2-ITD-001 / T2-ITD-002
TypeIndirect Thermal Dryer (ITD) — high-temperature thermal input, 200–400°C
Case 2 sizingSized for post-centrifuge feed (~25–30% DS input). 36× smaller than Case 1.
Thermal sourceWHSG High-Temperature Thermal — REG-WHSG-001 via NXS-Z2-FLUID. Steam or thermal oil, 200–400°C. Connector: ASI-THM-HT. ICD: ICD-WHSG-T2ITD-001.
Thermal duty1.2–1.5 kg thermal equivalent per kg H&sub2;O evaporated (parametric)
Output<10% moisture dry sludge char at rated throughput
Vapor managementFully enclosed vapor capture; ASI-APS-FLG connection at vapor outlet; 400 CFM normal / 700 CFM peak per unit. Temperature: 80–150°C vapor.
OEM shortlistLCI Corp (horizontal and/or vertical evaporator dryer) + minimum one additional US manufacturer per American Manufacturing Preference Policy
CAPEX [Class 2 ±15%]$1,600K–$5,000K per unit (range maintained pending LCI Corp + second vendor OEM quote)

5.4 T2-IMP/VRM — Impact Mill / VRM Pulverizer

TypeImpact mill or vertical roller mill; application-selected at OEM Gate 2 per Enhancement Admix grindability test
Output<500 μm at P90
CAPEX$400K–$1,000K per unit

6. APS Interface Register

Capture PointNormal CFMPeak CFMTemp at CaptureMaterial
T2-LBK enclosure (per unit)200400Ambient–40°CEnhancement Admix dust, H&sub2;S traces
T2-ITD vapor outlet (per unit)40070080–150°CWater vapor, organic acids, H&sub2;S, VOCs
T2 pulverizer (per unit)150300Ambient–50°CSub-500 μm Enhancement Admix powder
TOTAL T2 APS~1,500~2,500All T2 capture points combined

7. Modular Installability & ICD

ICD ReferenceInterfaceConnection TypeASI StandardTest RequirementStatus
ICD-TR2-T2-001T2 inlet from Trough 2 walking floorAR400-lined inlet hopper; matched to walking floor discharge chuteCarbon steel hopper flangeSAT: material flow continuity; SCADA feed rate signalDEFINED — Rev 2
ICD-0D-T2-001Module 0D liquid inlet4-in. 316L SS flange from LBS-MNF-001 to Trough 2 liquid inlet port316L SS ANSI 150# RFSAT: flow continuity; DS% routing to SCADADEFINED — Rev 2
ICD-T2-EAS-001Enhancement Admix outlet to SHRD-EAS4-in. 316L SS pneumatic transfer; 80 psi max; flangedPneumatic transfer flange; 316L SSFPT: <500 μm product at SHRD-EAS inlet verified by samplingDEFINED — Rev 2
ICD-T2-APS-001APS connections — all T2 capture pointsASI-APS-FLG flanged duct at all capture pointsASI-APS-FLGSAT: negative pressure confirmed at all capture pointsDEFINED — Rev 2
ICD-T2-PWR-001NXS-Z1-ELEC power — module MCC800V DC device linkASI-PBK-QCSAT: all drives energized; SCADA confirmedDEFINED — Rev 3
ICD-T2-DAT-001NXS-Z1-ELEC SCADA dataModbus TCP/IPASI-DAT-MOD-TCPSAT: all T2 process variables visible in facility SCADADEFINED — Rev 3
ICD-WHSG-T2ITD-001NXS-Z2-FLUID — WHSG High-Temp Thermal to T2-ITDSteam or thermal oil, 200–400°C; ASI-THM-HT drop at T2-ITD thermal boundaryASI-THM-HTFPT: T2-ITD outlet moisture <10% at rated throughput; thermal supply within specOPEN — OER Gate 2: D-THM-01 + D-13
ICD-T2-WTR-001Process water — CIP and polymer dilutionASI-WTR-001ASI-WTR-001SAT: flow continuity at T2-PCM-001DEFINED — Rev 2
ICD-T2-N2-001NXS-Z3-GAS — N&sub2; inerting (VRM/Impact Mill)NXS-Z3 drop; pneumatic fittingPer N&sub2; specSAT: N&sub2; pressure confirmed at VRM zone before first runDEFINED — Rev 3
ICD-T2-LCH-001Leachate to Liquifact systemGravity or pumped; 4-in. 316L SS316L SS flangeSAT: zero discharge path confirmed; flow to PRE-LFB-001 confirmedOPEN — OER Gate 2: water treatment ICD

NEXUS Zone Connections — Module T2

ZoneConnectionConnector
NXS-Z1-ELECHVDC 800V device feed (all T2 VFD motors); 48V controlsASI-PBK-QC; ASI-DAT-MOD-TCP
NXS-Z2-FLUIDWHSG High-Temp Thermal (T2-ITD); process cooling waterASI-THM-HT; ASI-WTR-001
NXS-Z3-GASN&sub2; (VRM inerting); instrument compressed airNXS-Z3 drop
NXS-Z4-MATAPS Capture Stream ductwork; T2-PNT pneumatic transfer to SHRD-EASASI-APS-FLG

8. Utilities Register

NXS-Z1-ELEC — Electrical

EquipmentP50 Load (kW)P90 Load (kW)Notes
T2-DCN-001/002 decanter drives (bowl + back-drive)52–77 kW each77 kW eachVFD; ATEX Zone 22
T2-ITD-001/002 agitator/drive (per unit)22–55 kW each55 kW eachOEM-dependent; confirm at sizing
T2-LBK-001/002 lumpbreakers22–37 kW each37 kW eachVFD
T2-IMP/VRM-001/002 pulverizers45–75 kW each75 kW eachVFD
T2-PNT-001 pneumatic conveying blower30–55 kW55 kW
T2-PCM-001 polymer system5–10 kW10 kW
Controls and instrumentation (48V DC)~3 kW~3 kWNXS-Z1 48V bus
Module T2 TOTAL ELECTRICAL~250–420 kW (400 TPD basis)Dual units at 50% duty; one string running

NXS-Z2-FLUID — Thermal and Cooling

UtilityDemand (400 TPD)SourceNotes
WHSG High-Temp Thermal (T2-ITD primary)~320–430 kW thermal (steam or oil equivalent)REG-WHSG-001 via NXS-Z2; ASI-THM-HTReplaces all prior steam header references. Parameters OPEN — D-THM-01.
Process cooling water~2–5 m³/dayNXS-Z2 cooling loopCIP and seal cooling

NXS-Z3-GAS and NXS-Z4-MAT

ZoneUtilityDemandNotes
NXS-Z3-GASN&sub2; inerting (VRM/Impact Mill zone)Continuous flow at VRM operating pressureATEX Zone 22 requirement; flow rate per VRM OEM
NXS-Z3-GASInstrument compressed air80–90 psi; ~20 scfmActuated valves, controls
NXS-Z4-MATAPS Capture Stream — total T2~1,500 CFM normal / ~2,500 CFM peak
NXS-Z4-MATPneumatic transfer to SHRD-EAS (T2-PNT-001)Per product throughput80 psi max

9. Vendor Matrix

EquipmentVendor / OEMCountryProcurement PathLead Time
T2-ITD Indirect Thermal DryerLCI CorpUSADirect — US Manufacturer28–40 wks
T2-ITD (alt)TBD at Gate 2 — second vendor requiredVerify at RFQDirect or ASI-Integrated28–40 wks
Decanter CentrifugesAlfa LavalSwedenASI-Integrated20–28 wks
Decanter CentrifugesANDRITZAustriaASI-Integrated20–28 wks
Decanter CentrifugesFlottwegGermanyASI-Integrated20–28 wks
Enhancement Admix LumpbreakersPennsylvania CrusherUSADirect — US Manufacturer14–20 wks
Enhancement Admix LumpbreakersStedman MachineUSADirect — US Manufacturer14–20 wks
VRM / Impact Mill (T2)Bradley PulverizerUSADirect — US Manufacturer28–36 wks
VRM / Impact Mill (T2)Gebr. PfeifferGermanyASI-Integrated28–36 wks
Polymer Conditioning (T2-PCM)NetzschGermanyASI-Integrated8–12 wks

10. CAPEX Estimate

All values: Class 2 (±15%) [2026 USD].

Line ItemLow [2026 USD]High [2026 USD]Basis
Decanter centrifuges (T2-DCN) ×2$800K$1,800KAlfa Laval ROM
Belt filter press (backup option)$300K$700KParametric; confirm need at OER Gate 2
Polymer conditioning system (T2-PCM)$80K$180KDay tank + dosing pumps; ROM
Indirect Thermal Dryers (T2-ITD) ×2$1,600K$5,000KRange maintained pending LCI Corp + second vendor OEM quote (D-01 open; blocked by D-13)
Enhancement Admix Lumpbreakers (T2-LBK) ×2 + ASI-ISO-LBK-001$320K$720KROM + isolation mount ROM
VRM / Impact mill (T2) ×2$400K$1,000KParametric
Enhancement Admix storage silos (T2 storage)$200K$500KCarbon steel epoxy lined; parametric
Pneumatic transfer (T2-PNT) system$150K$350KTo SHRD-EAS silos; parametric
Conveyors and transfers (internal)$400K$800KAll belt/screw internal; parametric
E&I (15%)$761K$1,658KFactor
Modular Assembly (15%)$761K$1,658KFactor
Contingency (15%)$761K$1,658KClass 2
MODULE T2 TOTAL [Class 2 ±15%]$6,533K$16,024KCAPEX will narrow when T2-ITD OEM quote received at Gate 2

11. TIC WBS Reconciliation

Equipment scope includedAll T2-xxx tagged equipment, E&I, MCC, Modular Assembly labor, contingency per Section 10
ExcludedPIMB building (facility civil scope); APS main system (CBT-APS-TDS-001); WHSG thermal supply infrastructure beyond module NXS-Z2 tie-in (Regenesis scope); water treatment module for leachate (Owner scope); commissioning and operator training; OEM grindability test (Owner cost)
All-in TIC (Module T2 only)~$6.5M–$16.0M [Class 2 ±15%]

12. Lead Time Schedule

EquipmentLead Time (weeks)Critical PathNotes
T2-ITD Indirect Thermal Dryers — critical path28–40YESCustom-sized to Case 2 feed rate and WHSG thermal input; OEM sizing confirmation required before order. Blocked by D-13 → D-THM-01 → D-01 sequence.
Decanter Centrifuges (T2-DCN)20–28NoStandard commercial; order at OER Gate 2
VRM / Impact Mill (T2) — grindability-dependent28–36CONDITIONALOrder ONLY after Enhancement Admix grindability test confirms specification
Enhancement Admix Lumpbreakers (T2-LBK)14–20NoStandard cage mill; available from stock or short-order
Polymer conditioning system (T2-PCM)8–12NoStandard assembly
Pneumatic transfer system (T2-PNT)10–16NoStandard industrial; fabricate to T2 outlet spec

13. TRL / ERL / IRL Assessment

SystemTRLERLIRLAssessment Notes
Decanter centrifuges955Mature commercial; municipal biosolids standard
Indirect Thermal Dryer (T2-ITD)943LCI evaporator dryer technology is proven; Case 2 scale at T2 throughput and WHSG thermal source requires OEM sizing confirmation. IRL=3 pending WHSG ICD resolution (D-THM-01).
Enhancement Admix Lumpbreakers + ASI-ISO-LBK-0019 / 844Lumpbreaker TRL=9; kinetic isolation factory integration novel
VRM / Impact Mill (T2 Enhancement Admix path)944Enhancement Admix grindability test required
WHSG→T2-ITD thermal interface833First cross-protocol thermal interface; ICD-WHSG-T2ITD-001 open; D-THM-01 unresolved
OVERALL T2833Gated by T2-ITD OEM sizing, WHSG thermal ICD, and Enhancement Admix grindability test

14. Confidence Factor

FactorWeightScoreWeightedBasis
Technology maturity (TRL)25%8/1020.0%Decanter and T2-ITD TRL=9; WHSG thermal interface TRL=8
Engineering completeness (ERL)20%5/1010.0%T2-ITD Case 2 scale, WHSG parameters, and VRM grindability all OPEN limit score
Integration readiness (IRL)15%5/107.5%WHSG→T2-ITD ICD open; D-13 and D-THM-01 unresolved
Vendor availability15%8/1012.0%LCI Corp shortlisted; all decanter categories 3+ vendors
Operational heritage15%7/1010.5%Individual equipment proven; WHSG→T2-ITD thermal loop at this scale novel
Regulatory / permitting10%7/107.0%Standard industrial equipment; facility permitting Owner scope
TOTAL BASE SCORE100%67.0%Lower vs. Rev 2 reflects correctly acknowledging WHSG ICD as open
ADJUSTED (ASI guarantee uplift)75%Recovers to ACCEPTABLE CONFIDENCE upon D-13 + D-THM-01 resolution. Target: re-score at OER Gate 2 after WHSG ICD closed.

15. Availability Model

EquipmentMA (%)MTBF (hrs)MTTR (hrs)Basis
Decanter centrifuges (2×, 50% duty)94–972,000–4,0006–12Alfa Laval ALDEC reference: municipal biosolids (2018–2024)
Indirect Thermal Dryers T2-ITD (2×, 50% duty)93–972,500–4,0008–16LCI Corp evaporator dryer operating reference: industrial thermal drying service. Parametric pending OEM sizing confirmation.
Enhancement Admix Lumpbreakers (2×, 50% duty)95–983,000–5,0004–8Pennsylvania Crusher cage mill reference: industrial mineral duty
VRM / Impact Mill (2×, 50% duty)93–962,500–4,0008–12Gebr. Pfeiffer VRM reference: industrial mineral/cement duty
SYSTEM OA (N+1 across all stages)91–95N/AN/AN+1 on all process-critical equipment. Primary external dependency: WHSG thermal supply from Regenesis — WHSG availability governs T2-ITD uptime.

16. Risk Register

R-01 MEDIUM — T2-ITD OEM Sizing at Case 2 Scale (Process/Performance)
WHSG thermal source confirmed; OEM sizing at Case 2 feed rate not yet confirmed by LCI Corp or second vendor. Mitigation: (1) Issue RFQ to LCI Corp with confirmed thermal input spec after D-13 resolved; (2) Require OEM to provide performance guarantee with sizing; (3) CAPEX high estimate ($5.0M/unit) accommodates scale uncertainty until Gate 2.
R-02 HIGH — WHSG Thermal Supply Integration (Integration/ICD)
D-13 (Liquifact injection) unresolved — WHSG thermal budget to NXS-Z2 is not confirmed. If Liquifact injection consumes a significant fraction of WHSG output, T2-ITD thermal supply may be constrained. Mitigation: (1) Resolve D-13 as Session 5 first priority; (2) T2-ITD OEM specify acceptable thermal input range with derating curve; (3) If WHSG budget insufficient: supplement with Zero-E Thermal Recovery Stream for pre-heating duty.
R-03 LOW — Lumpbreaker Vibration at High Enhancement Admix Lump Fraction (Safety)
High-lump WTE-derived Enhancement Admix (>75 mm P90) could exceed lumpbreaker capacity. Mitigation: (1) ASI-ISO-LBK-001 vibration trip ≤7 mm/s protects equipment and triggers automatic stop; (2) Oversize lump screen at T2 inlet upstream of lumpbreaker.
R-04 MEDIUM — Enhancement Admix Grindability (Process/Performance)
VRM/Impact Mill specification for T2 cannot be finalized without Enhancement Admix grindability test. Mitigation: (1) Collect Enhancement Admix samples from Owner feedstock source before OER Gate 2; (2) Schedule parallel grindability tests with Bradley Pulverizer and Gebr. Pfeiffer; (3) Contract T2 VRM with performance guarantee conditioned on test results.

17. Spares Register

Crit.EquipmentQty First FillQty OperatingNotes
ADecanter centrifuge scroll hard-facing (per unit)2 scroll sets1 set/18 monthsWear item in abrasive sludge/Enhancement Admix service
AT2-ITD thermal seal and rotor wear components (per unit)1 full set per unitPer OEM PM scheduleHigh-temperature service; OEM-specified replacement interval — confirm at Gate 2
AASI-ISO-LBK-001 neoprene isolation pads (per lumpbreaker)2 full pad setsPer degradationReplace when static deflection deviates >10% from 1.5 in. nominal
BVRM grinding roller wear segments (per mill)1 full set1 set/18 monthsHigh-wear item on Enhancement Admix duty
BDecanter centrifuge bearing sets (per unit)1 setPer failureCritical rotating equipment; stock at commissioning
BPolymer dosing pump diaphragms (T2-PCM-001)4 diaphragmsPer failureStandard item; short lead time
CPneumatic transfer line wear elbows (T2-PNT-001)2 setsPer wear316L SS; replace at >50% wall thickness wear

18. Warranty Register

EquipmentWarranty PeriodOEM GuaranteeCoverage / Notes
Decanter Centrifuges (T2-DCN)24 monthsYes — OEMParts and labor; scroll hard-facing wear excluded after 12 months
Indirect Thermal Dryers (T2-ITD)18–24 monthsYes — OEM (LCI Corp preferred; second vendor required)Parts and labor; thermal performance guarantee (<10% moisture output) contingent on WHSG thermal supply within spec per ICD-WHSG-T2ITD-001.
Enhancement Admix Lumpbreakers (T2-LBK) + ASI-ISO-LBK-00118 monthsYes — ASIASI integrates lumpbreaker + ASI-ISO-LBK-001 as single warranted skid assembly. Rotor wear excluded after 6 months. Unitized Warranty Passport issued at FAT.
VRM / Impact Mill (T2)18–24 monthsYes — OEMPerformance guarantee: <500 μm at P90 conditioned on Enhancement Admix grindability within test-confirmed basis.
Polymer Conditioning System (T2-PCM-001)18 monthsYes — OEMDosing accuracy guarantee ±2% at setpoint. Diaphragm wear excluded after 6 months.
END OF DOCUMENT — CBT-PRE-TDS-004 | Rev 3 | April 2026 | CONFIDENTIAL — CARBOTURA INC.
Case 2 CONFIRMED | ARM-2026-002 Incorporated | T2-ITD (LCI Corp) | WHSG 200–400°C | RevCon 3 Baseline