Advanced Circular Manufacturing
Engineering Documentation Portal
OEM-grade engineering specifications, interface control documents, and operations procedures for the Carbotura ACM Modular Factory system.
Document Status Dashboard
OER Classification
Class 2
±15% accuracy — investor-bankable
ICD Status
0 TBD
All interfaces defined — Rev 1
Open Actions
5
Tracked to named OER gates
Terminology Firewall
Active
v1.0 — all documents enforced
RevCon Baseline
RevCon 3
$150M–$325M/yr revenue floor
ASI Model
Active
Multi-integrator qualified
⬡
Pregenesis Protocol
9 documents
Technical Design Specification
CBT-PRE-TDS-002
Modules 0A, 0B & 0C — Truck Intake, Feedstock Ingest & Trough System, Exit Airlock
Technical Design Specification
CBT-PRE-TDS-003
Modules 1–4 — Primary Shredding, Hammermill, Ash Pulverizer & Rotational Mixer
Interface Control Document
CBT-PRE-ICD-001
Pregenesis Protocol ICD — ASI Standardized Connectors & Skid-Integrated Spring Isolation
Operations Procedure
CBT-PRE-OPS-002
Feedstock Ingest Operations — Truck Intake, Trough Feed, Bay Assignment
Operations Procedure
CBT-PRE-OPS-003
Shredder Train Operations — Primary Shredder, Hammermill, AFR Control
Operations Procedure
CBT-PRE-OPS-004
Trough 2 Processing Operations — Dewatering, Drying, Pulverizing
Engineering Design Package
CBT-EDP-SHRD-001
Shredder Train — ASI Procurement Package
FMEA Register
CBT-PRE-FMEA-001
Pregenesis Protocol — Failure Mode & Effects Analysis Register
CAPEX Summary
CBT-PRE-CAPEX-001
Pregenesis Protocol — Total Module CAPEX [Class 2 ±15%]
📖
Reference Documents
2 documents